Locating and surveying
Locating concealed manholes and covers in Vienna, Lower Austria and Burgenland
Since the garden was rebuilt the water meter chamber has been somewhere under the lawn, the inspection chamber under the new driveway. Until the cover has been found, nobody can reach the meter, the connection or the drain – and digging is done on suspicion. We search for the cover non-destructively and mark the point at which it is to be opened. Describe the case on +43 (0) 2252 53169 or in writing to office@cft.at, Monday to Thursday 8:00–16:30, Friday 8:00–12:00.
What we do on site
If there is an access to the pipe at the building, we travel outwards from there with camera equipment towards the manhole and take a bearing on the camera head at the surface – the manhole lies where the pipe arrives. If nothing at all is known, we reverse the direction and search the area with magnetometer and ground-penetrating radar until cover or manhole body shows up.
Key facts at a glance
| Methods | CCTV survey from the house connection outwards, sonde location in the camera head, electromagnetic locating of the incoming pipe, magnetic locating (magnetometer), ground penetrating radar (GPR) |
|---|---|
| Application range | Manhole covers, frames and entry openings, water meter and inspection chambers at the house, in the yard and in the garden |
| Duration | One to four hours, depending on the effort. |
| Result format | Marking on the surface, documentation as required as .pdf |
| Service area | Vienna, Lower Austria and Burgenland |
For you as a private customer
A manhole rarely disappears all at once. First a load of gravel is added, then the new driveway, then grass grows over it – and the next time round nobody knows where it was. It is looked for when there is a hurry: the drain has backed up, the meter is to be changed, the connection is to be jetted. The search is non-destructive and works from two sides: through the service from the inside, if there is an access at the house, otherwise from the surface. What follows is opening up in one place instead of three.
How the job runs
1. Enquiry and documents. You contact us on +43 (0) 2252 53169 or in writing to office@cft.at. Anything that exists helps: old plans, photographs taken before the alterations, the recollection of whoever last opened the cover.
2. Establishing access. What matters is whether there is a way into the service at the house – an inspection opening, a cleaning pipe, an open connection. If there is one, we work from the inside outwards. If there is not, we narrow down the area to be searched from the line of the service, the alignments and the falls.
3. Locating. With access we drive the service away from the house and take a bearing on the camera head at the surface via the sonde, until it stands beneath the manhole. Without access the magnetometer covers the area, and ground penetrating radar follows up where there is no iron.
4. Marking and handover. The point found is marked and photographed; exposing it is done by your plumber or your building contractor.
Equipment and methods
CCTV survey from the house connection outwards
The quickest way to the manhole rarely runs across the area, but through the service. If there is an inspection opening, a cleaning pipe or an open connection at the house, we push the camera in there and drive outwards – with the fall, in the direction in which the waste water runs. The manhole is where the service arrives: at the junction, at the change of direction, where two runs come together. The image also says what is waiting there before anybody opens up. An opening the camera can pass through is needed; bends, displaced joints, roots and the reach of the rods set the limit.
Sonde location in the camera head
The camera image on its own gives only the distance in metres, not the place in the garden. A transmitter sonde therefore sits in the camera head: it radiates from a single point, and its position can be taken at the surface together with a depth reading, down to 2.5 m. When the head stands in the junction, the operator stands above the manhole. This allows a plastic pipe on which no electromagnetic signal holds to be followed as far as the manhole as well.
Electromagnetic locating of the incoming pipe
If the service is metallic or has a tracer wire in it, it also works without a camera: an alternating current signal is applied to the pipe or the tracer wire and the route is followed at the surface. Where it ends, turns off or meets a second pipe run is usually where the manhole lies. This is the method with the greatest reach downwards: as far as 5 m. A connection point and a conductive path are needed; in densely occupied routes the signal couples across onto neighbouring services.
Magnetic locating with the magnetometer
If nothing at all is known – no access, no service, no clue – the direction is reversed and the area itself is searched. The magnetometer measures the disturbance of the earth’s magnetic field caused by a ferromagnetic body. Cast iron covers and frames therefore show up under asphalt, gravel and soil as well, without any applied signal, and they do so quickly and across the area. The search depth is one metre at most – deeper than that the disturbance is lost in the earth’s field. The second limit is set by the surroundings: plastic and concrete covers stay invisible, and where reinforcement, building rubble or metal fences lie, the deflection is lost in the interference.
Ground penetrating radar (GPR)
Where there is no iron, ground penetrating radar works the same area. An antenna sends short electromagnetic pulses into the ground; at every interface with different electrical properties, part of the pulse is reflected and recorded as a travel time. This makes concrete rings, the manhole structure and the void beneath it visible – precisely the cases in which the magnetometer finds nothing, and at two metres at most it reaches twice as deep. The limit is the ground: in cohesive or wet material the penetration depth falls, and under dense reinforcement the image becomes unreadable.
What you receive
The marking on the surface is the result. That is where the opening up is done, and that is what it is for. We record the point found with it – beyond that we make no promises about the place.
Paint on paving and grass does not survive rain for long. Anyone who will need the manhole again later is best advised to photograph the marking themselves while it is fresh.
Costs and effort
We give neither a figure nor a guide price, because the search area, the make-up of the surfacing and the number of points being looked for determine the effort involved; we agree the cost range by telephone beforehand. For the re-survey the same applies as for any locating work: if our measurement was wrong, it is free of charge; if it was correct and the search simply was not precise enough or the digging not deep enough, the call-out is charged. Trace and access cover under buildings insurance does not apply here; it concerns leak detection after an escape of water.
Frequently asked questions
The manhole is not on any plan. Can you still find it?
Usually yes, because we do not search by the plan but for the component itself. If there is a way into the service at the house, we drive outwards from there with the camera and so get from the known point to the unknown one. If there is not, we search the area itself: first with the magnetometer, then with ground penetrating radar.
Do you also find manholes made of concrete or with a plastic cover?
Not with the magnetometer, because the iron for that is missing. The way then runs through the service: camera and sonde from the house connection as far as the junction. If that is not possible either, ground penetrating radar remains, which shows the manhole structure and the void beneath it instead of the cover.
How deep can the search go?
That depends on the method, not on the manhole. The magnetometer reaches one metre at most, ground penetrating radar two. Through the service we get further: the sonde in the camera head can be taken down to 2.5 m, and electromagnetic locating of the incoming pipe carries as far as 5 m. That is why the question of access comes first – from the inside we reach depths that no longer show from the surface.
Do I have to clear anything away beforehand?
Any iron on the search area disturbs the magnetic search: reinforcement and building rubble in the ground, a metal fence at the edge. What is fixed in place cannot be cleared away – there we follow up with the second method.
And if you are off the mark?
Then we re-survey. If our measurement was wrong, that costs nothing. If it was correct and the digging was done beside the marking or too shallow, we charge for the call-out – there is then no measurement error on CFT’s part.
Do you also open up and rehabilitate the manhole?
No. CFT locates, marks and records. Exposing it, changing the cover and rehabilitation are carried out by your building contractor or your plumber, with our findings as the basis.
Related services
Drain and pipe cleaning
When the manhole has been found and the drain is to be cleared.
Sewer documentation for older networks
When it is not one cover that is missing, but the whole route that is unknown.
Burst and leak detection in and around buildings
When it is not the access point that is being looked for, but the leaking point on the service.
Describe what you are observing.
Just describe what you see – add a photo, and we can often settle on the right method before we even call back.
What happens next
- We read your message and match the case to a method.
- We come back to you – usually with a question that shortens the appointment.
- We confirm the appointment and what it costs before anyone sets off.
Rather talk?
+43 (0) 2252 53169
Mon–Thu 8:00–16:30 · Fri 8:00–12:00
Describe your case.
Fastest by telephone – then we settle straight away which method fits and what you should prepare.
Outside office hours, write to office@cft.at.