Cable fault location on medium-voltage (MV) cables throughout Austria and southern Germany
An outgoing feeder has failed, the protective device has tripped, and in the as-built plan the route ends where the site begins. On the medium-voltage ring the location work decides whether one excavation is opened up or a hundred metres of route. CFT surveys in the fault, marks it on the surface and hands over a report as a basis for the work; the repair remains with your network operator or cable jointer. Report the affected feeder on +43 (0) 2252 53169 or in writing to office@cft.at, and we will agree isolation, standby supply and an appointment.
What we do on site
On medium voltage, high-resistance faults predominate, and they give no echo in the reflectogram. The condition check therefore comes first: insulation and resistance decide whether measurement can proceed directly or whether the point has to be surged and burned down first. During burn-down the outgoing feeder is completely out of service – what that means for your supply belongs settled before the appointment, not at the measuring point.
Key facts at a glance
| Methods | Insulation and resistance measurement, surge and burn-down, sheath fault location on plastic-sheathed cables, Ley effect, time domain reflectometry (TDR) in network operation, bridge measurement (Murray loop), cable identification in trench and cable tray |
|---|---|
| Application range | Buried medium-voltage cables belonging to utility companies, municipal utilities, local authorities and industrial businesses, including joints and terminations |
| Duration | Two hours minimum on site, thereafter by the hour according to effort. If burning down is required, the job takes longer. |
| Result format | Damage report as a PDF |
| Service area | The whole of Austria from Traiskirchen; southern Germany, that is Bavaria and Baden-Württemberg, via CFT Group Deutschland GmbH, Lange Zeile 27, D-85435 Erding |
For you as a business
For utility companies, municipal utilities, local authorities and industrial businesses it is not only the position found that counts but its traceability: we document the method, the prelocation distance and the confirmation obtained by pinpointing, so that the road opening is justified to the highway authority and to internal audit. Isolation including earthing, and the repair, remain on your side; we carry out the measurements. Because the measuring equipment and the evaluation for these fault types are kept specifically for this purpose, we travel for it throughout Austria and to southern Germany, not only within the area around the two sites.
Burning down means a shutdown – and of more than one core
Before anything is located, the condition is established. Insulation and resistance measurement say which cores are damaged and how high-resistance the fault is. That value decides how the job continues – and whether your installation stands still while it does.
If the value is low enough, measurement and pinpointing follow directly and the route is recorded in the same pass. If it is too high, the fault position yields nothing: it first has to be surged and burned down until it becomes earth-sensitive. During that process the feeder is not partly but completely out of service. Burning down regularly damages the neighbouring phases as well; what was still running in a limited way beforehand may not run at all afterwards.
For utility companies, municipal utilities and industrial businesses this means: before burning down, it has to be settled how the time without supply will be bridged. Either a standby supply is available – a switchover in the network or a temporary arrangement, whichever your installation allows. Or the excavator is on site and opens up as soon as the position is established, so that jointing can follow immediately and the feeder is missing only for the duration of the repair.
That decision belongs in the job coordination, not at the measuring point. Tell us when you report the fault whether a switchover is possible and who arranges it.
How the job runs
1. Report and coordination. You report the outgoing feeder, cable type, length and fault pattern, and name the contact for the switching operations. We clarify which substations have to be accessible and whether a switchover is possible if it comes to that.
2. Isolation and earthing. The cable is completely isolated from both ends, secured against re-energisation and earthed – carried out by the network operator or by your own electrician, in accordance with your operating instructions. CFT does not carry out switching operations. The measurement only begins once you have released the cable.
3. Establishing the condition. Insulation and resistance are recorded core by core on the isolated feeder. This establishes what is damaged and how high-resistance it is – and with it, whether measurement can continue directly or whether burning down has to come first.
4. Prelocation and line tracing. Time domain reflectometry, bridge measurement or sheath fault location gives the distance to the fault position, in the case of high-resistance faults after burning down. In parallel the route is marked at the surface, and the positions of joints and branches are recorded as well.
5. Pinpointing and handover. The position is narrowed down, marked and photographed, and surveyed in where required. From the road opening onwards, your cable jointer takes over.
6. Check measurement after jointing. The feeder is cut for the repair; both resulting sections then have to be measured for further fault positions before the supply is restored. Whether your own operations team does that or we do is settled beforehand.
Equipment and methods
Insulation and resistance measurement
The first reading does not answer where the fault is, but what one is dealing with. Core by core, the insulation is recorded against earth and against the remaining cores, together with the resistance. The result sets the course for the entire job: a low-resistance fault can be followed up immediately, a high-resistance one cannot. For your operating records the same finding is at the same time the survey of the feeder’s condition at the moment of failure.
Surge and burn-down to make the fault earth-sensitive
High-resistance faults show no echo in the TDR trace, and it is precisely this type of fault that predominates on medium-voltage cables. If the insulation value stays too high, the fault position is invisible to every measuring method. It is therefore subjected to surge voltage and burned down until the transition resistance falls far enough for it to become earth-sensitive – only then does fault location work at all. This is the step with consequences for your operation: the feeder is completely dead while it happens, and the neighbouring phases are frequently damaged as well. It therefore has to be settled beforehand how the loss of supply will be bridged – by a switchover or temporary arrangement, or by having the excavator standing ready to open up immediately after the location work.
Sheath fault location on plastic-sheathed cables
A sheath fault is damage to the outer plastic sheath through which moisture reaches the cable screen; the installation often keeps running while corrosion is already at work. For location, a pulsed DC voltage is applied to the screen, the current leaves the cable at the damaged point and creates a voltage gradient which is picked up with two earth spikes and reverses direction above the fault position. On sealed surfaces, over reinforcement, or where the screen is earthed at several points, the gradient is blurred.
Ley effect
On distribution runs that have grown over time, the TDR trace often gives no unambiguous picture, because every joint and every branch split sets a marker of its own. The Ley effect does not work with echoes but with the behaviour of the applied signal along the route: consistent up to the fault position, no longer beyond it. That allows the section in which the ground is to be opened to be narrowed down – a narrowing which, together with the measured distance and the route, becomes the excavation instruction.
Time domain reflectometry (TDR) in network operation
In the distribution network, time domain reflectometry also serves as a survey of the existing assets: the trace shows joints, branch splits and terminations as recurring markers. If the current trace is compared with an earlier measurement of the same run, the new discontinuity stands out.
Bridge measurement (Murray loop)
Unlike time domain reflectometry, bridge measurement does not depend on an echo: it evaluates resistances instead of reflections and gives a distance even where the trace shows nothing but joints and branches. With an earth fault on one core, the ratio of the lengths follows from the comparison with a sound core of the same cable. What is needed is access to the far end, a consistent cable construction and a sufficiently low-resistance fault.
Cable identification in trench and cable tray
In distribution networks several systems lie side by side, some of them live. Cable identification identifies the cable being sought within the bundle beyond doubt before it is cut; if all the cables are of identical construction, the involvement of your operations team is required.
What you receive
You receive the fault position marked and a damage report as a PDF with the method, readings, distance, route and photographs, which can be attached to the excavation instruction.
Costs and effort
There is no flat rate, because cable type, length of run, type of fault and accessibility determine the effort; we agree the cost range by telephone before the job. Cover by an insurer is not the normal case in the network sector.
The check measurement is part of the job. If there is no fault at the marked position because our measurement was wrong, we measure again at no charge. If the measurement was correct and the excavation was simply not searched carefully enough or not dug deep enough, we charge for the call-out, because there was no measuring error on CFT’s part. The same rule applies to cable location and pipe location.
Frequently asked questions
Who isolates and earths the cable?
The network operator or your own electrician. The cable has to be completely isolated from both ends and earthed before we start – CFT does not carry out switching operations. Measurement begins only after your express release at the measuring point.
Does the feeder have to stay dead for the whole job?
Yes. Without isolation from both ends including earthing by the network operator or your own electrician, no measurement is carried out. If burning down is added, it goes further: the feeder is then completely dead, because burning down frequently damages the neighbouring phases as well. How long that lasts depends on what has been prepared: a standby supply that absorbs the outage, or the excavator on site that opens up immediately after the location work so the repair can follow.
Can a sheath fault be located while the installation is still running?
No. In operation only the position of the cable can be traced – not the sheath fault itself. To measure it, the cable has to be completely isolated from both ends.
The fault may be in a joint. Does that change anything?
Yes. Joints appear as markers in the TDR trace, which is why their positions are recorded beforehand. That helps twice over: a known joint position is a point of suspicion and at the same time the explanation for a marker that would otherwise be read as a second fault.
We dug and found nothing. Who pays for the check measurement?
The check measurement is carried out in any case; it is part of the job. If our measurement was wrong, it is free of charge. If the measurement was correct and the search at the marked position was simply not careful enough or not deep enough, we charge for the call-out, because there was no measuring error on CFT’s part. That applies to every cable fault location, cable location and pipe location job.
Can you supply the fault position for our GIS?
The surveyed fault position can be prepared as a point with attributes and taken into your asset records. Interface and format are agreed before the job.
Is the feeder sound again after the repair?
That is only established by a check measurement. The cable is cut for the joint, and both resulting sections have to be checked for further fault positions – on aged feeders the fault found is often not the only one. Whether your cable jointer does that or we make a second visit belongs in the job coordination.
Related services
Cable fault location, low voltage
The same measuring technique in the distribution network, where the high-resistance fault is not the predominant type.
Cable testing, low and medium voltage
When nothing has failed and the condition is to be assessed rather than a fault sought.
Network location and cable identification
When the route is missing from the asset records.
Site and route clearance survey
So that before the road opening it is clear what else lies in the excavation.
Describe the findings.
The more precisely you describe the findings, the more directly we can go to work. Plans, readings and photos help us settle the method in advance.
What happens next
- We read your message and match the case to a method.
- We come back to you – usually with a question that shortens the appointment.
- We confirm the appointment and what it costs before anyone sets off.
Rather talk?
+43 (0) 2252 53169
Mon–Thu 8:00–16:30 · Fri 8:00–12:00
Describe your case.
Fastest by telephone – then we settle straight away which method fits and what you should prepare.
Outside office hours, write to office@cft.at.